Serve Group recently removed over 300 tons of contaminated soil from 3 different areas at Glebe, to assist in the demolition and upgrade to areas of Johnston’s Creek. Serve Group used Geofab to cover the soil between shifts.
Serve Group recently removed over 300 tons of contaminated soil from 3 different areas at Glebe, to assist in the demolition and upgrade to areas of Johnston’s Creek. Serve Group used Geofab to cover the soil between shifts.